Please select any industry to search for stories on that industry.
Back to Document List  
 Select for DeliveryPrint  Email  Download
      


Copyright 2017 Global Data Point
Provided by Syndigate Media Inc.(Syndigate.info)
All Rights Reserved


Energy Monitor Worldwide
December 6, 2017 Wednesday
183 words
MidAmerican Energy places order with Vestas to deliver 70MW wind turbines

Berkshire Hathaway Energy subsidiary MidAmerican Energy Company has placed an order to Vestas for the delivery of V110-2.0MW turbines for the 2,000MW Wind XI project in Iowa, US.

To be built at Vestas four factories in Colorado, the turbines are expected to be delivered in Q2 2018.

Scheduled to be fully operational by 2020, the Wind XI project will enable MidAmerican Energy to produce an estimated 95% of its annual retail load from wind.

The project comprises multiple sites in Iowa that will enter service between 2018 and 2019.

Vestas US and Canada sales and service division president Chris Brown said: We are pleased to continue working with MidAmerican Energy on this next phase of the Wind XI project.

The production, construction, and operations of the turbines for Wind XI will generate significant economic benefits for landowners, their community, and the supply chain that supports these American-made turbines.

The current order includes supply and commissioning of the turbines in addition to a multi-year Active Output Management 5000 (AOM5000) service agreement. 2017 Global Data Point.
December 6, 2017
      
Back to Document List 
 
Copyright © 2017 LexisNexis, a division of Reed Elsevier Inc. All Rights Reserved.  
Terms and Conditions   Privacy Policy 

2017 AMT-The Association For Manufacturing Technology
AMT@AMTonline.org
7901 Jones Branch Dr.
Suite 900
McLean, VA 22102-3316
Tel.703-893-2900 Fax 703-893-1151